Pipe Line Relocations

               

  
Project

Respond to a rupture in 36 inch main, recover the product, install a temporary section and relocate 2000 feet of 36 inch pipe

  Scope of Work

bullet

Respond to the rupture

bullet

Recover product and install 120 feet of 36 inch temporary piping

bullet

Concrete coat 1500 feet of 36 inch pipe with 5 inches of concrete and 120 feet with 8 inches of concrete

bullet

Install 2000 feet of 36 inch, 0.625 wall, concrete-coated pipe

bullet

Tie-in to existing line

bullet

Re-route Reedy River to install new line

bullet